The following warnings occurred:
Warning [2] Undefined variable $unreadreports - Line: 36 - File: global.php(961) : eval()'d code PHP 8.0.30 (Linux)
File Line Function
/inc/class_error.php 153 errorHandler->error
/global.php(961) : eval()'d code 36 errorHandler->error_callback
/global.php 961 eval
/showthread.php 28 require_once





Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
1996 Q4 WHOLE LIFE CYCLE COST RAIL v ROAD
#1
Hello,
Do you know what four aspects for the railway's design and operation??

I am not sure the answer for four aspects for railway's design and operation?? please help on it.

Thank you.

Question 4 in 1996
Compare and contrast the whole life-cycle environmental impact of building a new long haul freight railway versus investment in additional infrastructure for road freight to travel over the
same route. [8 marks]
If a new freight railway is to be built, what four aspects of the railway
Reply


Messages In This Thread
1996 Q4 WHOLE LIFE CYCLE COST RAIL v ROAD - by oxfordjack - 28-09-2009, 05:42 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)