2010 Q6 Overlaying a Transmission Based signal system over a fixed Signal System
#1
Hi All,

I have had a go at 2010 Q6 and would like some feedback. I'm a little unsure of the first part and could have probably done with a couple more points for the second part. I assume that for 10 marks they were hoping for 5 risks and 5 mitigations.

I know that at just short of 2 pages it is a little thin on the ground but I'm unsure of what I have missed.

Any feedback would be welcome.

Thanks

Rich

P.S. there doesn't seem to be much forum activity lately is everyone enjoying this little heat wave or is there always a lull this time of year?