12-09-2008, 07:24 PM
Astubbs Wrote:Seems like a fairly straight forward layout.. however, the spec asks for standage for a freight train clear of the junction and single line at C on the down valley branch, in both directions. Freight train is 400m long, the branch isnt quite. How is standage possible without fouling either the junction or the single line. Am i missing something obvious? (is it just a really tight fit?) Any help or a hint would be much appreciated. Thanks
I'm not in the same place as my copies of the layouts and I cannot remember it in enough detail. Can you scan a section to remind me? Otherwise, I'll have a look in the office, but that might not be until Wednesday. Unless anyone else has one to hand.

