Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
2008 Module 2 Calcs for Main line layout, Sort of signalling in branch line
#1
Dear Members,
2008 Examination – Module 2 - Main line layout

Permitted speed for passenger trains – Main lines – 160 km/h
Permitted speed for passenger trains – Branch lines – 100 km/
h

Headways at minimum signal spacing and at a speed of 140 km /h
Fast passenger train following fast passenger train – 2 minutes
Fast passenger train following stopping passenger train – 4 minutes
Station dwell times – 30 seconds

By using headway speed 140 km/h, we can find the sort of signalling in main line.
How to find the sort of signalling in branch line ?

Kindly clarify. Thanks in advance.

Regards,
NJK
Reply


Messages In This Thread
2008 Module 2 Calcs for Main line layout, Sort of signalling in branch line - by NJK - 18-09-2012, 11:19 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)