Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
Hi All
#8
Certainly worth investigating.
I am back from India after the Bank Hoiday and will be in a better position to do so after then.

(23-05-2013, 11:23 AM)dorothy.pipet Wrote: I've had a quick look at the scheme plans where MCB-ODs have been commissioned (not a project I was involved in myself). In that case the overlap at the crossing is a POL ending before the crossing; the protecting signals are all controlled (with auto button); the previous signals are all distants and the previous stop signals all controlled. Not all that helpful as a comparison really.

It does seem to me that something doesn't add up with that sketch. I'm tempted to say either the Entrance/exit symbol is incorrect or the button should be an (A) - is there some way you can double check these?
PJW
Reply


Messages In This Thread
Hi All - by adobe - 19-05-2013, 07:21 PM
RE: Hi All - by Peter - 19-05-2013, 09:10 PM
RE: Hi All - by nionita - 20-05-2013, 11:44 AM
RE: Hi All - by PJW - 20-05-2013, 05:10 PM
RE: Hi All - by Peter - 20-05-2013, 08:39 PM
RE: Hi All - by PJW - 21-05-2013, 01:26 PM
RE: Hi All - by dorothy.pipet - 23-05-2013, 11:23 AM
RE: Hi All - by PJW - 23-05-2013, 03:12 PM
RE: Hi All - by yass100 - 25-01-2014, 08:43 AM

Forum Jump:


Users browsing this thread: 1 Guest(s)