#12
All the recent schemes I've worked on have been TORR by track sequence:
the default has been berth and first tracks;
if that's not possible (e.g. no berth track or berth track is permissive) then second and third.

I do recall something about "unconditional" TORR but like PJW I think that is not for passenger lines. In the case where TORR is not possible as above (I can think of a track from a non-TC siding to a permissive platform with only 3 tracks) NR have generally accepted that TORR will not be provided.
Reply


Messages In This Thread
TORR- Train Operated Route Release - by PJW - 24-07-2012, 11:10 PM
RE: TORR- Train Operated Route Release - by PJW - 27-07-2012, 05:16 PM
RE: TORR- Train Operated Route Release - by PJW - 30-07-2012, 06:30 PM
RE: TORR- Train Operated Route Release - by PJW - 01-08-2012, 09:00 PM
RE: TORR- Train Operated Route Release - by PJW - 01-09-2014, 06:00 PM
RE: TORR- Train Operated Route Release - by dorothy.pipet - 01-09-2014, 08:21 PM