29-12-2016, 02:31 PM
Hi,
I have been working on technical specifications. In basically , Which informations should be included in a technical specification for a new line? I only consider informations that to be written quantitative, such as headway, dwell time, maximum speed , temporary speed restrictions etc. I exclude the interfaces between signal system and other systems.
What can be written about the following topics?(From the railway administrator perspective)
Interlocking
Track circuits&Axle counters
Switches
Signals
Train-wayside communication
ATP and ATO
Reliability,availability,maintainability and safety
Especially ,about the track circuits & axle counters, signals and point machines Can you share with me If you have technical specification? Happy New Year to all! Thanks.
I have been working on technical specifications. In basically , Which informations should be included in a technical specification for a new line? I only consider informations that to be written quantitative, such as headway, dwell time, maximum speed , temporary speed restrictions etc. I exclude the interfaces between signal system and other systems.
What can be written about the following topics?(From the railway administrator perspective)
Interlocking
Track circuits&Axle counters
Switches
Signals
Train-wayside communication
ATP and ATO
Reliability,availability,maintainability and safety
Especially ,about the track circuits & axle counters, signals and point machines Can you share with me If you have technical specification? Happy New Year to all! Thanks.

