The following warnings occurred:
Warning [2] Undefined variable $unreadreports - Line: 36 - File: global.php(961) : eval()'d code PHP 8.0.30 (Linux)
File Line Function
/inc/class_error.php 153 errorHandler->error
/global.php(961) : eval()'d code 36 errorHandler->error_callback
/global.php 961 eval
/showthread.php 28 require_once





Thread Rating:
  • 0 Vote(s) - 0 Average
  • 1
  • 2
  • 3
  • 4
  • 5
2017 Q5 Train Control / ATP
#2
Moving Block CBTC may be a bit extreme as a proposed train protection system onto an existing mixed traffic railway. Consider real world examples where ATP is being put onto mixed traffic lines eg ETCS level 1 type ATP systems using existing lineside signals (eg NSW), or ETCS level 2 type ATP systems (eg Thameslink,) with cab signalling for the ATP area and retaining lineside signals outside of this area.
Reply


Messages In This Thread
2017 Q5 Train Control / ATP - by tfc82 - 18-09-2018, 01:24 PM
RE: 2017 Q5 Train Control / ATP - by hayesip - 25-09-2018, 11:44 PM
RE: 2017 Q5 Train Control / ATP - by tfc82 - 29-09-2018, 12:53 PM

Forum Jump:


Users browsing this thread: 1 Guest(s)